Shutdown team

Shutdown Team Roles and RACI Matrix

Short answer

A shutdown team is a temporary organization with one accountable leader, the shutdown manager, and clear decision rights for planning, operations, safety, contracts, materials and cost. A RACI matrix makes ownership explicit: one person is Accountable for every activity.

How MaintWiz helps: Everyone sees the same plan and their part of it. The MaintWiz shutdown module gives technicians checklists with readings and photos, sends findings to the planner and shows a Today view of what needs attention. See the module · Get the daily progress template

By · Published · Last reviewed

What MaintWiz adds:Today page for the plannerChecklists with readings and photosFindings to the plannerHandover notes and as-left summary

The roles

Who does what in a shutdown team?

A shutdown team is a temporary organization with one accountable leader, the shutdown manager, supported by planning, operations, safety, contracts, materials and cost roles, each with a clear decision right. 1

A stop puts hundreds of people in a plant for a short time, so ownership has to be explicit. The table lists nine roles that appear on most large stops. Titles differ by company and country; match the role, not the title. For how the team feeds the plan, see how to plan a plant shutdown and the 40-step checklist.

Shutdown roles: what each one answers for
RoleAnswers forTypically decidesWorks most with
Steering groupObjective, budget and window of the stopGo or no-go, budget changes, scope additions above a limitShutdown manager
Shutdown managerSafety, schedule, cost and scope of the whole stopPriorities, recovery actions, approval of scope changes within limitsEveryone below
Planner and schedulerWork packages, the logic-linked schedule and the baselineSequence, logic and duration; reports float and the critical pathDiscipline leads, shutdown manager
Area or discipline leadQuality and progress of the work in one area or craftCrew allocation, method, daily priorities within the schedulePlanner, operations, contractors
Operations leadTaking the plant out of service and restarting itHandover of equipment to maintenance and back, startup sequenceShutdown manager, permit coordinator
Permit coordinator and safety leadIsolations, permits and safe work on siteWhether a permit is issued, suspended or withdrawn; stop-work callsOperations lead, contractors
Contracts leadContractor mobilization, claims and performanceContractor selection, mobilization dates, variation ordersShutdown manager, planner
Materials plannerParts and tools staged on site and readyKit release, expediting, substitution of partsPlanner, area leads
Cost controllerBudget, cost reporting and forecastAccruals and forecast method; flags overruns to the shutdown managerShutdown manager, planner

The matrix

What does a shutdown RACI matrix look like?

A RACI matrix marks each person on each activity as Responsible (does it), Accountable (owns the result, one person only), Consulted (gives input before) or Informed (told after); the one rule that makes it work is exactly one A on every row.

A free Excel version is available: RACI matrix (.xlsx).

The matrix below covers twelve activities across the eight working roles. Read across a row to see who does what; read down a column to see whether one role carries too much. Where two activities meet, as in the readiness review, several people are Responsible but one person is still Accountable.

RACI matrix for twelve shutdown activities
ActivityShutdown managerPlannerArea leadOperationsSafety and permitsContractsMaterialsCost control
Set the objective and windowACICCIIC
Freeze the scopeARCCCIIC
Build and baseline the scheduleARCCICCI
Approve a scope changeARCCCCCR
Develop work packagesIARCCCCI
Select and mobilize contractorsCCIICAIC
Stage parts and toolsICCIIIAI
Hold the readiness reviewARRRRCRC
Isolate, issue permits, verifyIICRAIII
Run daily progress controlARRCCCCC
Hand equipment back and restartCCCARIII
Report cost and forecastCCIIICIA

Three checks before you issue a RACI matrix

  • Every row has exactly one A
  • No column is mostly R: that person is a bottleneck
  • No row has an A and no R: nobody does the work

The matrix is a working template, not a published standard. The letters are the common RACI convention. Change the assignments to fit your own organization and legal duties.

Software

Can software hold the roles and the RACI?

Software cannot choose your shutdown manager, but it can make roles real: each person sees only their own menus, every approval carries a name and a time, and a work package has one owner.

About MaintWiz. MaintWiz is an industrial AI platform with IoT, SAP integration and predictive maintenance (PdM) capabilities. Its shutdown and turnaround module helps plants plan, schedule, execute and close out shutdown work.

Also see the work package guide.

What the shutdown module covers

As described on the MaintWiz shutdown maintenance product page.

  • Work packages with an owner, crew, dates and tasks, linked to the schedule
  • Role-based menus: each role sees only its own screens, set by an administrator
  • Readiness gates with waivers and sign-offs recorded with a reason, the name and the date
  • Approvals recorded against the signed-in user with the name and the time
  • Executive view with a health matrix and decisions ranked by effect
  • Permits and isolations from ePTW shown on each work order
  • Handover note and as-left summary on each work order

Small teams

How do you organize a shutdown with a small team?

In a small plant one person carries several roles, so combine roles that do not conflict, name a deputy for every role, and keep the permit issuer separate from the person whose work the permit covers.

The scaffolding coordinator role is described in turnaround scaffolding planning.

Most plants do not have a dedicated shutdown department. A team of six or seven people can run a short stop if the roles are mapped to people on purpose rather than by habit. The table shows one way to combine them. It does not set a size: a longer or higher-risk stop needs more people in the safety and permit roles first.

A small-team shutdown: how the roles combine
PersonRoles they carryWatch for
Maintenance managerShutdown manager and steering contactKeep operational firefighting out of the stop; decide who deputizes
PlannerPlanner, scheduler, materials plannerPlanning load peaks before the stop; protect their time in the weeks before
Lead technician or foremanArea lead for all craftsCannot be in two places; split areas when crews exceed what one person can see
Operations shift leadOperations lead and restart sequenceHandover to maintenance needs a named person on every shift
Safety officerSafety lead and permit coordinatorDo not let the person who issues permits also approve their own work
Buyer or storekeeperContracts, materials and cost reportingLong-lead parts need an owner months before the stop

For the planning side of a small stop, see manufacturing plant shutdown planning with a small team.

Rules

Which shutdown roles do US and UK rules address?

No rule prescribes a shutdown organization chart, but US and UK rules and guidance assign duties for contractor control, lockout, permits and handover that your role map must cover. 2,4,3

Roles that US and UK rules or guidance address
RoleRule or guidanceWhat it saysSource
Contracts lead and shutdown managerOSHA 1910.119(h), US covered processesThe host employer evaluates the safety performance of contractors, informs them of hazards and emergency plans, and controls their presence in covered areas; the contractor trains its peopleOSHA 1910.119
Contracts leadHSE HSG159, managing contractorsA guide for employers that sets out how to manage contractorsHSE HSG159
Safety lead and operations leadOSHA 1910.147(f)(2)-(3)Host and outside employers inform each other of their lockout or tagout procedures; group lockout and tagout is coveredOSHA 1910.147
Permit coordinatorHSE HSG250, permit-to-work systemsGuidance for the petroleum, chemical and allied industries on permit-to-work systems, including training, competence, planning and monitoringHSE HSG250
Operations lead and area leadsHSE shift handover guidanceHandover has three elements: preparation, an exchange between outgoing and incoming staff, and a cross-checkHSE shift handover

Visuals

Save the team charts

Two charts to share with the team. Click either for the full-size image.

FAQ

Frequently asked questions

What is a shutdown organization?

A temporary team layered over normal plant operations for the length of a stop, with one accountable leader, defined decision rights and a daily reporting rhythm.

Who leads a shutdown?

A shutdown manager is accountable for safety, schedule, cost and scope. A steering group above that person sets the objective, the window and the budget, and decides on large changes.

What does RACI stand for?

Responsible, Accountable, Consulted and Informed. The person who does the work is Responsible. One person owns the result and is Accountable. Others who give input are Consulted, and those told afterward are Informed.

How many people should a shutdown team have?

No public standard fixes a number. It depends on the size and risk of the stop. A small plant combines roles in a few people; a large turnaround adds area managers, discipline leads and a planning and controls group.

How do you run a shutdown with a small team?

Combine roles that do not conflict, name a deputy for each, and keep permit approval separate from the work it covers. See manufacturing plant shutdown planning.

What roles do contractors have?

Contractor supervisors run their crews and follow site rules. The host stays responsible for evaluating contractors, informing them of hazards and controlling their presence. 2,4 See contractor management in shutdowns.

Who owns the schedule?

The planner or scheduler keeps the baseline and reports the critical path and float; the shutdown manager decides what to do about them. 1 See shutdown scheduling.

How often should the team meet?

A short decision-focused meeting every day during the stop is common practice, plus a readiness review before it starts. See progress tracking and the daily meeting.