T&I Turnaround and Inspection Planning: Gulf Terms

Short answer

T&I means turnaround and inspection: a major refinery turnaround that includes inspection work, as used in Gulf refining. This page defines the terms around it, shows one published example, gives an illustrative gated planning model and says plainly what public sources do not provide.

Public sources on T&I are limited. The gated model is MaintWiz's own framework, not any operator's method.

How MaintWiz helps: T&I programs need inspection scope and schedule in one plan. The MaintWiz shutdown module gives plant teams one plan for scope, schedule, permits, spares and execution, from the first work package to close-out. See the module · Get the data sheet

By · Published · Last reviewed

What MaintWiz adds:Scope, schedule and permits in one planSpares status with SAPReadiness gatesFindings to the planner

Terms

What is T&I in a refinery?

T&I means turnaround and inspection: a major refinery turnaround that includes inspection work, as in "a major turnaround and inspection (T&I)" at Ras Tanura Refinery, whose plants are on a five-year T&I cycle. 1

EIA describes a refinery turnaround as a planned, periodic shutdown of one or more processing units to perform maintenance, inspection and repair, and says routine turnarounds on key fuel production units are planned for every three to five years. 2 AFPM calls a turnaround a planned period of extensive maintenance, renovation and capital investment and says what separates it from an outage is that it is planned. 3

T&I and the words around it
TermMeaningSource or status
T&ITurnaround and inspection: a refinery turnaround that includes the inspection work, used in Gulf refiningHydrocarbon Engineering
TurnaroundA planned, periodic shutdown of one or more refinery processing units to perform maintenance, inspection and repairEIA
Turnaround (AFPM)A planned period of extensive maintenance, renovation and capital investment; the key distinction from an outage is that turnarounds are plannedAFPM
ShutdownAny deliberate stop of a plant or unitTerms compared
Statutory turnaroundA turnaround driven by a legal inspection duty; usage varies by countryNo authoritative definition found; not used as a definition here

I found no single authoritative Gulf definition of T&I. The first row rests on one published example. See shutdown vs turnaround vs outage for the general comparison.

Example

How big is a refinery T&I?

One published example shows the scale: Hydrocarbon Engineering reports a Ras Tanura Refinery T&I with 27- and 32-day unit turnarounds, 9,258 permits, over 500,000 man-hours and a peak of over 1,900 people on site per day. 1

One published T&I example (Ras Tanura Refinery, 2018)
ItemFigure reported
Fractionation unit T&I27 days against a 28-day benchmark
Platformer unit T&I32 days against a 35-day benchmark
Permits issued9,258
Man-hoursMore than 500,000
Peak on-site manningMore than 1,900 people per day
Contractor companies13

The figures are from one trade-press report of one refinery in 2018. They are not a benchmark and the report attributes its benchmark days to Solomon Study refinery benchmarks and does not say how they were applied. There is no published T&I duration benchmark.

Software

Can software support a gated T&I process?

Software can hold the gates as readiness checks with evidence and signed waivers, and keep the baseline, schedule and permits in one record; the gate contents are yours to set.

About MaintWiz. MaintWiz is an industrial AI platform with IoT, SAP integration and predictive maintenance (PdM) capabilities. Its shutdown and turnaround module helps plants plan, schedule, execute and close out shutdown work.

What the shutdown module covers

As described on the MaintWiz shutdown maintenance product page.

  • Gantt chart with the critical path and float
  • Baselines that show what moved against the plan
  • Readiness gates with signed waivers and the name and date
  • Resource availability by trade and week, with blackout windows from the admin calendar
  • Permits and isolations from ePTW on each work order
  • Portfolio view of up to 20 concurrent projects

Gated planning

What is a T&I gated process?

A gated T&I process is a stage-by-stage planning method in which the turnaround moves to the next stage only when a review confirms the work of the last; the gate contents used by Gulf operators are not published, so the model below is our own illustrative framework. 5

An illustrative gated T&I planning model (MaintWiz framework)
GateQuestionEvidence to seeChecklist steps
1. ScopeIs the objective, window and scope defined and ranked?Objective, window, scope register, criticality rankingSteps 1 to 6
2. Freeze and planIs the scope frozen and the work packaged and scheduled?Baseline scope, work packages, logic-linked scheduleSteps 7 to 12
3. ReadinessAre people, parts, permits and isolations ready?Resource plan, material readiness, permit matrix, risk registerSteps 13 to 23
4. ExecuteIs the stop on the path to a safe restart?Daily control, hold points, punch listSteps 24 to 31
5. Restart and close-outCan the plant restart safely and what did we learn?Completion records, pre-startup review, lessonsSteps 32 to 40

The gates map onto the five phases of the 40-step checklist. The GAO schedule guide supports the underlying idea that a baseline is set and then controlled. 5 See scope management for the freeze.

This is a MaintWiz framework, not a description of any operator's gates. I found no public source for Gulf operator gate contents.

Benchmarks

How are turnaround durations benchmarked?

Turnaround benchmarking compares your cost and duration with similar plants, but the commercial benchmarking studies are not public, so this page quotes none; use your own history and any benchmark your company is licensed to use.

No vendor-neutral public benchmark for refinery turnaround duration was found. EIA gives planning lead times and interval ranges, not durations by unit: it says routine turnarounds on key units are planned for every three to five years, with one to two years of advance planning. 2 For how to measure your own performance see the KPI guide.

Inspection scope

What is an equipment inspection schedule in a refinery turnaround?

An equipment inspection schedule lists each vessel, line and tank due for inspection, the date it is due and the method, so the turnaround scope includes every inspection that falls due before the next stop; in the US, OSHA mechanical integrity requires inspection and testing of process equipment on a frequency set by manufacturers' recommendations and good engineering practice. 4

A free Excel version is available: T&I gate and inspection tracker (.xlsx).

Plan each due inspection into the scope before the freeze. For US rules and inspection codes see which OSHA rules apply to a shutdown and for refinery practice see refinery turnaround planning.

Visuals

Save the T&I charts

Two charts to share with your turnaround team. Click either for the full-size image.

FAQ

Frequently asked questions

What is T&I in a refinery?

Turnaround and inspection: a major refinery turnaround that includes inspection work. 1

How often is a T&I done?

One published example says the plants are on a five-year T&I cycle; EIA says routine turnarounds on key units are planned every three to five years. 1,2

What is a T&I gated process?

A stage-by-stage planning method where each gate confirms the work of the last. Operators' gate contents are not public; the model here is our own illustration.

How long is a T&I?

One published example reports unit T&Is of 27 and 32 days. 1 There is no published benchmark by unit.

Is TAR the same as T&I?

TAR is used as a short form of turnaround in some places. I found no authoritative source for it, so this page does not define it.

What is an equipment inspection schedule?

A list of each item due for inspection with its due date and method, used to set the inspection scope of a turnaround. 4

How are durations benchmarked?

Commercial benchmarking studies are not public; compare with your own history.

Is this specific to the Gulf?

The term is used in Gulf refining; the planning method applies to any turnaround.