PSSR Pressure Systems Safety Regulations: UK Guide

Short answer

In the UK, PSSR stands for the Pressure Systems Safety Regulations 2000, which require a suitable written scheme of examination to be in place before a pressure system is operated and the system to be examined in line with it. In the US, PSSR usually means a pre-startup safety review.

How MaintWiz helps: Examination dates and written schemes belong in the plan. The MaintWiz shutdown module checks seven readiness gates before a package starts and records waivers with a typed reason, name and date. See the module · Get the readiness checklist

By · Published · Last reviewed

What MaintWiz adds:Seven readiness gatesSigned waivers with name and dateKeyboard operationLook-ahead by gate

Two meanings

What does PSSR stand for in the UK and the US?

In the UK, PSSR stands for the Pressure Systems Safety Regulations 2000; in the US, it usually means a pre-startup safety review under OSHA 1910.119(i). 2,3

The two meanings of PSSR
UK: Pressure Systems Safety Regulations 2000US: pre-startup safety review
What it isRegulations on pressure systems used at workA review before startup of new or significantly modified facilities
Where it appliesGreat Britain, for pressure systems with a relevant fluidUS covered processes under OSHA 1910.119(i)
Key requirementA suitable written scheme of examination in place before use, and examinations in line with itConfirm that construction and equipment match design, procedures are in place, and training is complete before hazardous chemicals are introduced
Who must actOwners and users of pressure systemsThe employer
SourceHSE pressure systems, HSE INDG178OSHA 1910.119
Read nextThis pagePlant start-up after shutdown

The same four letters point to different things, so a search for PSSR may land on the wrong rule. This page covers the UK regulations. The US review is explained in the start-up after shutdown guide.

The regulations

What are the Pressure Systems Safety Regulations?

The Pressure Systems Safety Regulations 2000 apply to pressure systems used at work in Great Britain and aim to prevent serious injury from the stored energy released if a system or component fails; they cover systems with a relevant fluid and put duties on owners and users. 2

HSE says the regulations cover rigid pressure vessels with their pipework and protective devices, pipework with protective devices to which a transportable pressure receptacle is connected, and pipelines and their protective devices. 2 The relevant fluids are steam at any pressure, compressed or liquefied gas including air above 0.5 bar above atmospheric pressure, pressurized hot water above 110 °C, and dissolved acetylene. 2 Hydraulic oils are excluded. Schedule 1 lists exceptions.

Duty holders are the owners of mobile systems and the users of installed systems, such as a steam boiler. 2 Users of hired equipment should confirm a written scheme is in place and the examination certificate is current. 2

HSE says to check the exceptions in the regulations and the Approved Code of Practice (L122) to decide whether your own system is covered; this page does not decide that for you.

Software

Can software track written schemes of examination?

Software can hold each examination as a dated task with its preparatory work, so due dates, isolations and evidence sit together; it does not replace the competent person or the written scheme.

About MaintWiz. MaintWiz is an industrial AI platform with IoT, SAP integration and predictive maintenance (PdM) capabilities. Its shutdown and turnaround module helps plants plan, schedule, execute and close out shutdown work.

What the shutdown module covers

As described on the MaintWiz shutdown maintenance product page.

  • Preventive maintenance scheduling shared with the shutdown module, so due examinations can be seen before the freeze
  • Work packages with preparatory work, owner and dates linked to the schedule
  • Permits and isolations from ePTW shown on each work order
  • Work order tasks of kind tick, reading or photo for examination evidence
  • Instruments and calibration shared with the platform
  • Handover note and as-left summary on each work order

Written scheme

What is a written scheme of examination?

A written scheme of examination is a document, certified by a competent person, that identifies the items of a pressure system, what is to be examined, how, with what preparation and at what maximum interval; it must be in place before the system is operated. 1

A free Excel version is available: Written scheme of examination tracker (.xlsx).

Typical contents of a written scheme of examination
ContentWhy it matters in a shutdown
Identification of the items of plant in the systemTells you what is in scope of the examination
The parts of the system to be examinedSets which items must be accessible
The nature of the examination, including inspection and testing of protective devicesTells the planner which tests need a window
The preparatory work needed for the item to be examined safelyBecomes a work package: isolation, cleaning, access
The nature of any examination needed before first useApplies to new or modified items
The maximum interval between examinationsSets the latest date the examination can be done
Critical parts which, if modified or repaired, should be examined by a competent person before reuseAdds an examination hold point after repair
The name of the competent person certifying the scheme, and the dateEvidence for audits

HSE says the user or owner is legally responsible for defining the items that form the pressure system and which need to be in the scheme, though they may take advice. 1 The scheme should generally cover all items in a self-contained system that may give rise to danger: one system, one scheme. 1 A competent person normally advises on the nature and frequency of examination and the safety measures to prepare the system, and may draw up the scheme or certify one prepared by the user. 1 The scheme must remain suitable for the life of the plant, so it should be reviewed by a competent person at appropriate intervals. 1

Examples

Which systems need a written scheme of examination?

HSE gives typical examples: steam boilers, air receivers of 250 bar litres or more, autoclaves, accumulators, larger refrigeration systems and fixed LPG storage are likely to need a scheme, while machine tool hydraulics and low-pressure pipelines are exempt; HSE says these are guidance examples and the duty holder must decide. 1

Systems HSE lists as likely or unlikely to need a written scheme
Likely to need one (HSE examples)Exempt or not likely (HSE examples)
Compressed air receiver and pipework at 250 bar litres or moreMachine tool hydraulic system (exempt)
Steam boiler with associated pipework and protective devicesPipeline and protective devices not above 2 bar above atmospheric (exempt)
Steam sterilizing autoclavePortable fire extinguisher under the stated limits (exempt)
Gas-loaded hydraulic accumulatorVehicle tyre (exempt)
Vapor compression refrigeration system above 25 kW installed powerPneumatic cylinder in a compressed air system (not likely)
Fixed LPG storage system for workplace heatingPortable compressed air receiver under 250 bar litres (not likely)

The lists are HSE's examples for guidance only. You must decide whether your own system is covered.

In a shutdown

Do the Pressure Systems Safety Regulations affect a plant shutdown?

Yes: a shutdown is when many pressure system examinations and the repairs they find take place, so each due examination, its preparation and any examination after repair should be planned into the shutdown scope and schedule. 1,4

Placing pressure system examinations around a shutdown (working template)
WhenTaskWhy
Before planning startsList every item of plant with a written scheme and its due dateExaminations due before the next stop may force a date
At scope freezePut each due examination and its preparatory work into the scopeThe preparatory work is a work package
ReadinessBook the competent person; confirm isolation, cleaning and accessThe examiner needs a safe, accessible item
ExecutionExamine under the scheme; record the reportExamination in line with the scheme is a legal duty
After repair or modificationHold the item for examination of critical parts before reuseThe scheme can name critical parts that need examining after repair
Close-outUpdate the scheme and the due datesThe scheme must stay suitable

Isolation for an internal examination follows the same rules as other intrusive work. HSE guidance on isolation advises planning intrusive maintenance for shutdown periods to keep isolation needs down. 4 See the permit to work guide and scope management.

The timeline is our working template, not HSE guidance. HSE says the competent person normally advises on the nature, frequency and preparation for examinations.

Visuals

Save the PSSR charts

Two charts to share with your inspection team. Click either for the full-size image.

FAQ

Frequently asked questions

What does PSSR stand for in the UK?

Pressure Systems Safety Regulations 2000. 2 In the US the same letters usually mean a pre-startup safety review. 3

What is the difference between the UK and US PSSR?

The UK regulations require a written scheme of examination and examinations in line with it. The US review checks a new or significantly modified facility before startup. 1,3

What is a written scheme of examination?

A document, certified by a competent person, identifying the items of a pressure system, what is examined, how, with what preparation and the maximum interval. 1

Who is responsible for the written scheme?

The user of an installed system or the owner of a mobile system. They may take advice but remain legally responsible for defining its scope. 1,2

What is a relevant fluid?

Steam at any pressure, compressed or liquefied gas including air above 0.5 bar above atmospheric pressure, and pressurized hot water above 110 °C; dissolved acetylene is also covered. 2

How often must examinations be done?

The scheme sets the maximum interval between examinations; a competent person advises on it. 1

Do PSSR examinations affect a shutdown?

Yes. Plan each due examination and its preparation into the shutdown scope, and hold the item after repair if the scheme names it as a critical part. 1 See how to plan a plant shutdown.

Where is the UK safe isolation guidance?

In HSE HSG253. 4 See the UK and EU safety guide.