Skip to content
MaintWiz: Innovating Industrial AI

Data sheet

MaintWiz Shutdown Module Data Sheet

Short answer

This data sheet lists what the MaintWiz shutdown module does, where each capability lives, what it integrates with and where its limits are. The module is an add-on to the MaintWiz platform and covers scheduling, readiness gates, spares with SAP status, work orders, ePTW permits and an executive view.

Data sheet issued October 2026. It contains no outcome claims.

By · Published · Last reviewed

Covers:CapabilitiesSpecificationIntegrationsRolesLimitsRoadmap

Capabilities

What are the capabilities of the MaintWiz shutdown module?

The MaintWiz shutdown module covers portfolio planning, scheduling with critical path and float, readiness gates, cost control, spares with SAP status, work orders with checklists, permits and isolations from ePTW, close-out and an executive view, as the table lists with each capability’s location, integrations and limits. 1

A worked example of the module's measures: shutdown case study planned vs actual. Download this data sheet as a PDF.

The module is an add-on to the MaintWiz platform and reuses its work orders, spares, approvals, ePTW, preventive maintenance scheduling, instruments and calibration, and SAP integration.

MaintWiz shutdown module: capabilities, location, integrations and limits
CapabilityWhat the module doesWhere it livesIntegrationsLimits
Portfolio board and timelineShows current projects by phase or on a timeline; upcoming projects in a second tab; blackout windows from the admin calendarPortfolioAdmin calendarDesigned for up to 20 concurrent projects
Availability of trades and toolsTotal, used and available counts for each common tool and trade, and weekly availabilityPortfolio, AvailabilityResource master, Excel templatePool sizes are those you enter
ScheduleGantt chart and table of the plan, with dates, durations and float that agree on every screenPlan, ScheduleExcel, Primavera P6, Microsoft ProjectMonte Carlo, critical chain and what-if scenarios are planned
Critical path and floatLists critical activities and their float; flags an activity at or below an admin float limitPlan, ScheduleNoneFloat limit is set per facility or project
BaselinesShows what moved against the planPlan, BaselinesNoneForecast drill-down is planned
Readiness gatesChecks each work package against six gates and shows a go result; waivers and sign-offs need a typed reason and are saved with the name and the dateControls, ReadinessSpares, ePTW, resource planGate lead times are set in Admin
Cost controlPlanned value, earned value, actual cost, cost and schedule indices; budget, actual and forecastControls, Earned value and CostNoneDaily actual cost history is planned
Risk registerRisks with a score and an ownerControls, RiskNoneMonte Carlo finish confidence is planned
Spares and SAP statusNeeded, in stock, short and SAP cover; each short part shows none, request raised or order issuedSupply chain, ProcurementSAP through the PM or the MM moduleDoes not track delivery or arrival dates
Work ordersFive states, task list by activity type, tick, reading and photo tasks, limits on readings, hours, parts used, findings to the planner, handover note, attachments up to 5 MBExecute, Work ordersShared MaintWiz work order module; QR scanNo approval, root cause or corrective action step of its own; works offline on transaction screens
Permits and isolationsShow on each work order and in the readiness gate; an open permit or isolation blocks closing the packageExecute and ControlsePTWPermits are created in ePTW
Work packagesCompletion from closed tasks, derived status, closure with a reason, reopeningExecute, Work packagesNoneNone
Close-outHandover, lessons learnt, reports, deferred items, archive of closed projectsClose-outNoneNone
Executive viewHealth matrix, decisions with Approve and Decline, effect in days and money, one timeline of all projectsExec ViewNoneOpen risks ranked by days at stake is planned
AdministrationCalendars, shifts, rate cards, tool hire rates, units, planning rules and menu access by roleAdminNoneNamed-submenu access is planned

This data sheet contains no outcome percentages or performance guarantees. Figures appear only where they describe a design limit, such as the number of concurrent projects.

Specification

What are the main specifications?

The module is designed for up to 20 projects at once, organizes work as portfolio, project, work package, work order and task, and uses five work order states and seven gate checks, as the specification table lists.

Specification summary
ItemValue
HierarchyPortfolio, project, work package, work order, task
Concurrent projectsDesigned for up to 20 in one portfolio
Work order statesInitiated, work in progress, waiting, completed, reopen
Task kindsTick, reading with unit and limits, photo
AttachmentsUp to 5 MB each, with a thumbnail for images
Readiness gatesSix checks (materials, resources, predecessors, tools and scaffold, permits and isolations, scope and engineering) and a go result
SAP status of a partNone, purchase request raised, purchase order issued
MenusMy Day, Exec View, Portfolio, Project, Plan, Supply chain, Controls, Execute, Close-out and Admin
ExportsThe table behind each supply chain chart exports to Excel; schedules export to Primavera P6 and Microsoft Project
OfflineTransaction screens

Integrations

What does the module integrate with?

The module integrates with SAP through the PM or the MM module, with Excel, Primavera P6 and Microsoft Project, with IoT sources and with ePTW.

See shutdown software vs CMMS vs Primavera P6 for how these systems divide the work. For PM and MM modes see SAP PM shutdown management and SAP MM shutdown materials.

Integrations
SystemWhat it doesDirection
SAP (PM or MM module)Keeps SAP as the system of record and shows request and order status against each partReads status; objects depend on the mode chosen
ExcelLoads resources and work from templates; exports tablesImport and export
Primavera P6 and Microsoft ProjectExchanges schedules with the planners’ toolsImport and export
IoTBrings in sensor dataInbound
ePTWSupplies permits and isolationsInbound

Roles

Which roles use the module and what do they see?

A central planner sees every menu, a project manager sees every menu except Portfolio until an administrator allows it, and a foreman sees only My Day and the work orders of Execute by default.

A fuller RACI matrix is in shutdown team roles and RACI.

Default menu access by role
RoleDefault access
Central plannerEvery menu, including Portfolio
Project managerEvery menu except Portfolio, until an administrator ticks it; sees all projects of the facilities the user may access
ForemanMy Day and the Work orders submenu of Execute
AdministratorSets access in a grid of roles and menus; changes apply at once

Administrators can preview the system as another role.

Roadmap

What is planned but not yet available?

Monte Carlo finish confidence, critical chain analysis, what-if scenarios, forecast drill-downs, daily actual cost, ranked risks, AI actions with approval and named-submenu access are planned and are not available today.

See digital shutdown management for a plain account of what runs today and what is planned. For moves to S/4HANA see SAP S4HANA maintenance data migration.

Planned, not yet available
Capability
Monte Carlo confidence of the finish date
Critical chain analysis
What-if scenarios
What moves the forecast finish, with a drill-down
Forecast methods with formulas and inputs
Daily actual cost history
Risks ranked by days at stake
AI actions with an approval step
Access limited to named submenus

This sheet gives no release dates.

Definitions

Where do the terms on this page come from?

The scheduling, cost, isolation and SAP terms used on this page are defined by public sources: the HHS earned value glossary, the GAO schedule guide, OSHA, HSE and the SAP library. 2,1,3,4,5

Terms used on this page and where they are defined
TermPublic definition or ruleSource
Critical pathThe path through a network of dependent tasks with the longest elapsed time; any delay to a task on it delays the finish by the same amountHHS earned value glossary, GAO schedule guide
FloatThe time an activity can slip without delaying a later date; float is not contingencyGAO schedule guide
Earned value, CPI and SPIEarned value is completed work valued at its budget; CPI is earned value divided by actual cost and SPI is earned value divided by planned valueHHS earned value glossary
Lockout and isolationLockout places a lock on an energy isolating device so the equipment cannot be operated; OSHA 1910.147 sets the six steps and HSE HSG253 sets three isolation categoriesOSHA 1910.147, HSE HSG253
Reservation and purchase requisitionIn SAP Plant Maintenance the system generates both from order components; neither can be created individuallySAP Library

Definitions are paraphrased; read the source for the exact wording. The module descriptions on this page come from the MaintWiz product requirements, not from these sources.

FAQ

Frequently asked questions

What is this data sheet for?

It lists what the MaintWiz shutdown module does, where each capability lives, what it connects to and its limits, so a buyer or an IT team can check them. For an overview see the shutdown module page.

More questions are answered in the shutdown module FAQ.

Does the data sheet include performance figures?

No. It contains design limits only, such as up to 20 concurrent projects. It makes no outcome claims.

How is the module deployed and licensed?

This sheet does not cover deployment or licensing. Ask for a demo and the sales team will provide them.

Which systems does it connect to?

SAP through the PM or MM module, Excel, Primavera P6, Microsoft Project, IoT sources and ePTW.

Where are the questions about shutdown practice answered?

In the guides, starting with the pillar page and the 40-step checklist.

Where are the common questions?

See the shutdown module FAQ.

Check the sheet against your shutdown

Book a demo and bring your shutdown scope. We will walk through how MaintWiz can support it.

Book a demo